国产人妻一区二区三区四区五区六-国产农村妇女高潮大叫-亚洲最大成人网色-99久久亚洲精品无码毛片-99久久国产露脸精品国产麻豆

Aluminum alloy heat treatment and quenching process

Date:2020-05-27

Aluminum alloy heat treatment and quenching process

1、Aluminum alloy heat treatment process。

The purpose of this process is to make a large amount of hardening elements that can be used, such as copper, magnesium, zinc, or polydissolved solids, into a solid melt, which must be kept at a high temperature of 535 degrees to 550 degrees for a long enough time. 8 hours, and obtain a more homogeneous solid solution. 1. Aluminum alloy solid solution temperature, aluminum alloy rim solid solution state point is 530 degrees, the melting point is 555 degrees, beyond this temperature begins to melt into aluminum water。

Main points of aluminum alloy heat treatment process:

A.When warming up, first turn on the windmill cooling water first, then turn on the windmill fully to set the operating temperature and combustion status

When entering the furnace (the casting is placed with the A side facing up, and the A side is forbidden (during solution treatment))

B.Solid solution aging treatment conditions 545 degrees * 8H + 130 degrees * 6H The temperature must be stable and uniform, according to the design strength of the rim、

Material, characteristics, testing decision。

C.The quenching water temperature is 60 degrees-80 degrees water temperature, the casting is not easy to deform, and the quenching time is counted from the door to

The uppermost casting is fully soaked in water, and the time is 16 seconds to 20 seconds to complete the instant quenching water。

D.Full inspection items after solution treatment, deformation inspection, reshaping, steel characters to prevent abnormal quality tracking, every time after aging

The hardness of one casting is measured on the upper and lower layers of the trolley, the value is 65-75HB. Cooperating with continuous automatic operation is the same as high temperature operation, enter the furnace after the furnace is pre-fired, and enter and exit the furnace regularly according to the time set by the timer。

2、Delaying process of aluminum alloy quenching water。

When quenching water, the casting is taken from the solution temperature in the furnace to the quenching water. The time it takes is the delay of quenching water. The delay of quenching water is 15 seconds> 18 seconds. The most commonly used quenching liquid is water, and the rest is air or liquid nitrogen, etc., but the stress and distortion caused by quenching should be considered. Sometimes hot water is needed to prevent deformation and cracking. 5. Precipitation hardening When heat-treatable aluminum alloy is quenched to normal temperature, due to the low solubility of solute at low temperature, it produces a saturated and unstable state, so some tissues will precipitate in the base, and the precipitation effect at room temperature is Natural aging, if it needs to be heated to a certain temperature, the precipitation is artificial aging。


分享
×
主站蜘蛛池模板: 亚洲精品久久久中文字幕痴女| 巨大欧美黑人xxxxbbbb| yyyy11111少妇无码影院| 人妻精品动漫h无码| 亚洲精品国产av成拍色拍 | 狠狠色噜噜狠狠狠狠2021| 欧美激情精品久久| 国产av天堂无码一区二区三区 | www国产成人免费观看视频| 蜜桃传媒av免费观看麻豆| 天天做天天爱夜夜爽毛片毛片| 日韩美女在线观看一区| 国产成人精品福利网站| 国产亚洲精品线观看动态图| 少妇毛片一区二区三区| 99久久成人精品国产网站| 91蜜臀久久精品一区二区三区 | 粉嫩av国产一区二区三区| 伊人99综合精品视频| 寂寞少妇一区二区三区| 日韩一线无码av毛片免费| 久久人妻xunleige无码| 亚洲不卡av一区二区三区| 国产av天堂亚洲国产av下载| 先锋影音一区三区| 亚洲夜夜性无码国产盗摄| 超碰97人人做人人爱亚洲| 高跟丝袜av在线一区二区三区 | 久久无码中文字幕久久无码app| 日韩精品久久久一区二区 | 精品综合久久久久久888| xxxxx欧美| 欧美丰满熟妇xxxx性ppx人交| 国产乱子伦视频一区二区三区 | 暖暖视频 免费 日本社区| 久久无码人妻热线精品| 新国产三级视频在线播放| 国内精品一区二区99久免费视频| 亚洲v无码一区二区三区四区观看| 久久精品国产色蜜蜜麻豆| 少妇无码一区二区二三区|